Factory Rooftop Solar: A 10-Point Checklist Before You Invest

What factory owners and engineers should check before signing a rooftop solar contract – from roof strength to generator integration.

Updated · 1 min read

  1. Load profile: hourly or at least shift-wise demand, so solar never exceeds what the plant can absorb.
  2. Roof structure: a structural check of sheets, purlins and trusses, and the remaining life of the roof.
  3. Point of connection: LT side or 11 kV, transformer capacity and protection coordination.
  4. Generators: minimum loading of gas or diesel generators and how solar output will be limited to protect them.
  5. Reverse power: controls to prevent export when it is not allowed or when demand drops suddenly.
  6. Equipment: tier-1 modules, inverters with local service support, properly rated DC and AC switchgear.
  7. Fire safety: cable routing, fire breaks, DC isolation and labelling for fire fighters.
  8. Net metering and approvals: what is allowed for your connection and who handles the paperwork.
  9. Monitoring and O&M: cleaning frequency, response time and performance reporting in the contract.
  10. Warranties and guarantees: product, performance and workmanship – and who stands behind them in Bangladesh.

We design industrial plants around these points. See industrial rooftop solar or request an assessment.

Not sure what size you need?

Send us your electricity bill. An engineer will suggest the right system – free, no obligation.